Services

From PCBA to final assembly

PCBA manufacturing and precision repair, module and final assembly with functional testing, joint development and manufacturing cooperation.

01

PCBA manufacturing

Complex PCBA volume production on 7 SMT lines with 44 Hanwha placement machines, inline 3D SPI and MAOI/AOI inspection. We review drawings, panel and component configuration to define which processes you can entrust to us.

  • 7 SMT lines · 44 placement machines
  • PCB 50 × 40 ~ 510 × 460 mm
  • Minimum chip 03015 / 0402
  • Double-sided processing, BGA
See our technology

02

From module assembly to finished products

Procurement, assembly and testing tailored to each product.

  1. Component preparation
  2. Module and final assembly
  3. Functional testing and shipment

Final assembly experience with AV products in Indonesia applied to the fastening, wiring and testing of your products.

03

Beyond replacing parts, restoring function

Indonesian technical staff with at least 10 years' experience repair complex PCBAs.

BGA rework · reballing
Removal · solder-ball reforming · re-attachment

eMMC replacement · functional testing

eMMC replacement and programming, version checks and functional testing. We apply our production and repair experience with complex PCBAs such as TV mainboards.

04

Development and manufacturing partnerships for your product

Explore cooperation from joint development to procurement and series production.

01 Joint development

Review requirements and manufacturability. Discuss prototypes, testing and the transition to production.

02 Flexible manufacturing

Connect component procurement, PCBA manufacturing, module assembly and final assembly to suit the project.

Development, procurement, manufacturing and testing coordinated for each project.

Connecting production in Poland with Korean-affiliated suppliers

  1. Requirements
  2. HIT technical coordination
  3. Supplier discussions
  • Electronic components
  • Cables
  • Injection-moulded parts
  • Stamped parts

Sourcing and technical discussions through our network of Korean material, component and equipment suppliers.

We review production costs for your product

A quotation structure separating process, working time and initial preparation items.

01

Initial preparation

Programs · setup · tooling

Initial preparation cost separated from recurring production cost

02

Production · inspection

Assembly process · working time · testing

Reflects the product, volumes and inspection conditions

03

Materials · delivery

Agreed purchased items · packaging · transport

Costs reflect procurement and delivery scope

From your first board, start with us

Development, pilot and series production enquiries. Contact us with your product and target schedule.